Overall
shot of the rear setup when we got it.
|
The original boxing plates we cut out and
we will cap the top of the frame to get rid of the indent and
run a boxing plate back to a different crossmember location.
|
Here's the rear setup currently. The rearend
is mocked up in place, the original rear crossmember was cut out
and a new crossmember was located in a different spot for a better
4-link setup. The tops of the frame are capped and new boxing
plates are setup. We also sandblasted just the axle tubes to give
a clean surface to weld the 4-link and shock mounts to.
|

Front frame with a little more cut out for
bag clearance and drop spindles installed to get everything to
lay out.
|

4-link
is setup. It features 2x2 1/4 wall lower mounts 1.5 1/4 wall D.O.M.
Upper bars
|

We pre-made the boxing plates and slip
fit the bag mounts through them so we could weld both sides
of the mounts. Then welded the boxing plates onto the frame
rails.
|
|
|
|

Now
we will tube brace the mounts in three different areas for support.
|

The truck gets 11" of lift all
the way around.
|

Not to bad for being one tube with one
weld.
|
|

The
start of the sick shit.
|
|
|
|
|

Tube
work is finished. Now we throw some shocks into the mix, Finish
weld everything and call it done.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|