Like everything we start off with fresh steel.
A quick trip out to our blasting site and were ready to cut and
weld this up.
|

Fully tig welded the inside
and outside of the step notch.
|
|
|
|
Forward facing 4-link is in and the start
of the tube work has begun.
|
|
|
|
|
|
|
|
|
|
|
|
|
|

Our
control arms next to Djm and Stock control arms. Which would you
choose.
|

1
1/4" 1/4"wall DOM tube, built for bags to lay on 20's.
You need a set let us know.
|
|
|

All
painted, wired, plumbed, just need to finish the fuel cell and
the bed goes back on.
|

Fuel
cell we made. 20 gallons uses the stock fuel pump and sending
unit .
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|